Working objective: Operating extension sector in new virgin Mary hospital. We carry on all the works needed to join the old hospital with the new building including anti-bacterial vinyl floors and hospital cladding back-to-back including all the architecture of work.
In this site we made the following:
Full electrical network joining it with the old hospital.
Full plumbing network joining it with the old hospital.
Conch for the all of extension.
Light current network.
Supplying and installing the medical gas pip lying.
Supplying and installing the air conditioning system.
Gypsum board ceiling finishing it with antibacterial paints.